This page represents historical content
The City of Seattle considers historical information to be used for reference only. Details about its limitation are available in our Terms of Use.
Denny Way Paving Project
This project was completed in 2026.
We paved approximately 12 blocks of Denny Way and restored the pavement condition in this critical piece of Downtown Seattle’s arterial network. Work included sidewalk and curb ramp upgrades, additional signage, and bus stop consolidation.
Image shows a section of Denny Way with new asphalt paving
Improvements
The Denny Way Paving Project included:
- 12 blocks of asphalt paving
- 21 rebuilt curb ramps and 8 new curb ramps
- 8 total curb bulbs that shorten crossing distances, including 4 paint-and-post curb bulbs, a plastic curb and post bulb, and 3 concrete curb bulbs
- 28 "no turn on red" signs
- 25 painted stop bars at every intersection with a signal
- Sidewalk improvements
- Hardened centerlines reinforcing existing turn restrictions
- Bus stop changes to improve transit travel time and reliability
Project Map

Please click this link to download a PDF of the project map.
Funding
This project was funded in part by the nine-year Levy to Move Seattle, approved by Seattle voters in 2015. Puget Sound Regional Council (PSRC) awarded SDOT $1.45 million in Federal Highway Administration (FHWA) preservation grant funding to complete this project.
Community Outreach Lead
Darrell Bulmer
Project Manager
Bill Clark
Need a translation?
For information about our work to replace the road surface and make other safety improvements on Denny Way in your language, please call (206) 257-2243
Para información en su idioma sobre nuestro trabajo para reemplazar la superficie de la carretera y realizar otras mejoras de seguridad en Denny Way, llame al (206) 257-2243
Denny Way의 노면 교체 및 기타 안전 개선을 위한 교통국의 작업에 대한 정보를 귀하의 언어로 확인하시려면 (206) 257-2243으로 전화하십시오.
Để biết thông tin bằng ngôn ngữ của quý vị về việc chúng tôi thay thế bề mặt đường và thực hiện các cải tiến an toàn khác trên đường Denny Way, vui lòng gọi (206) 257-2243
有關我們在 Denny Way 上更新路面和進行其他安全改進工作的資訊(以您的語言),請致電 (206) 257-2243。
Project Materials
- Paving Flier (July 2025)
- Sidewalk Detour at Westlake Poster (June 2025)
- Nighttime Paving Flyer (June 2025)
- Paving Notification (May 2025)
- Construction Flyer (March 2025)
- Construction Postcard (March 2025)
- Presentation to C3 Group (February 2025)
- Construction open house PowerPoint (January 2025)
- Community Meeting Postcard (January 2025)
- Community Meeting Poster (January 2025)
- Community Meeting Yard Sign (January 2025)
- Project Map (April 2024)
- Community Coordination Committee (February 2024)
- Gates Foundation (January 2024)
- Mercer Corridor Stakeholders Group (January 2024)
- Seattle Convention Center (January 2024)
- YouthCare Briefing (December 2023)
- SIFF briefing (November 2023)
- Project flyer (November 2023)