Beacon Ave S Safety South Segment

This content has been professionally translated in other languages.

Este contenido ha sido traducido profesionalmente a otros idiomas.

此內容已被專業翻譯成其他語言。

此内容已被专业翻译成其他语言。

Nội dung này đã được dịch chuyên nghiệp sang các ngôn ngữ khác.

Qoraalkan waxaa si xirfad leh loogu turjumay luqado kale.

Ang nilalamang ito ay propesyonal na isinalin sa ibang mga wika.

ይህ ይዘት በሙያዊ በሌሎች ቋንቋዎች ተተርጉሟል።

እዚ ትሕዝቶ ብሞያዊ ኣገባብ ብኻልእ ቋንቋታት ተተርጒሙ ኣሎ።

ខ្លឹមសារនេះត្រូវបានបកប្រែដោយវិជ្ជាជីវៈជាភាសាផ្សេង។

The South Segment of the Beacon Ave S Safety Project extends along Beacon Ave S from S Myrtle St to 39th Ave S. The main project goal is improving safety for everyone living, working, and traveling in Beacon Hill. The project will include repaving and safety improvements for people walking, biking, and driving.

The project is currently in the early design phase, and we are gathering feedback from the community to inform our designs. The project will be in the design phase through fall 2027 and will begin construction in 2028.

El Segmento Central del Proyecto de Seguridad de Beacon Ave S se extiende a lo largo de Beacon Ave S desde S Myrtle St hasta 39th Ave S. El objetivo principal del proyecto es mejorar la seguridad para todos los que viven, trabajan y se desplazan por Beacon Hill. El proyecto incluirá la repavimentación y mejoras de seguridad para las personas que caminan, andan en bicicleta, conducen y usan el autobús.

El proyecto se encuentra actualmente en la fase inicial de diseño y estamos recopilando información de la comunidad para orientar nuestros diseños. El proyecto estará en la fase de diseño hasta el otoño de 2027 y se comenzará la construcción en 2028.

Beacon Ave S 安全專案的中段工程沿 Beacon Ave S 展開,範圍為 S Myrtle St 至 39th Ave S 路段。該專案的主要目標是為所有在 Beacon Hill 生活、工作與出行的人們改善安全狀況。該專案將包括重鋪路面,並為步行、騎自行車、開車與乘坐公車的民眾提供安全改善措施。

該專案目前仍處於初步設計階段,我們正在收集社區意見,以作為設計規劃之參考。該專案的設計階段將持續至 2027 年秋季,並預計於 2028 年開始施工。

Beacon Ave S 安全项目的中段工程沿 Beacon Ave S 展开,范围为 S Myrtle St 至 39th Ave S 路段。该项目的主要目标是为所有在 Beacon Hill 生活、工作和出行的人们改善安全状况。该项目将包括重新铺设路面,并为步行、骑行、开车和乘坐公交车的人们提供安全改善措施。

该项目目前处于早期设计阶段,我们正在收集社区的反馈意见,以指导我们的设计。该项目的设计阶段将持续到 2027 年秋季,并预计于 2028 年开始施工。

Phân Đoạn Trung Tâm của Dự Án An Toàn Beacon Ave S kéo dài dọc theo đường Beacon Ave S từ đường S Myrtle St đến đường 39th Ave S Mục tiêu chính của dự án là cải thiện an toàn cho tất cả mọi người đang sinh sống, làm việc và đi lại tại Beacon Hill. Dự án sẽ bao gồm việc lát lại đường và cải thiện an toàn cho người đi bộ, đi xe đạp, lái xe và đi xe buýt.

Dự án hiện đang trong giai đoạn thiết kế ban đầu và chúng tôi đang thu thập phản hồi từ cộng đồng để định hướng cho các kế hoạch thiết kế. Dự án sẽ ở trong giai đoạn thiết kế cho đến mùa thu năm 2027 và sẽ bắt đầu xây dựng vào năm 2028.

Qaybta Dhexe ee Mashruuca Badbaadada ee Beacon Ave S waxay gaarsiisan tahay Beacon Ave S laga bilaabo S Myrtle St ilaa 39th Ave S. Hadafka ugu weyn ee mashruucu waa in la hagaajiyo badbaadada qof kasta oo ku nool, ka shaqeeya, iyo u safraya Beacon Hill. Mashruuca waxa ku jiri doonaa dib-u-dhiska waddooyinka iyo horumarinta badbaadada dadka lugeynaya, baaskiilka wata, baabuurta wata, iyo kuwa raacaya Gaadiidka dadwaynaha.

Mashruucu wuxuu hadda ku jiraa marxaladda naqshadaynta hore, waxaana aanu ururinaynaa ra'yi-celin ka imanaysa bulshada si aan ugu wargelino naqshadahayaga. Mashruucu wuxuu ku jiri doonaa marxaladda naqshadaynta ilaa dayrta 2027 wuxuuna bilaabi doonaa dhismaha 2028.

Ang Sentral na Bahagi ng Proyekto sa Kaligtasan ng Beacon Ave S ay umaabot sa kahabaan ng Beacon Ave S mula S Myrtle St hanggang 39th Ave S. Ang pangunahing layunin ng proyekto ay ang pagpapabuti ng kaligtasan para sa lahat ng naninirahan, nagtatrabaho, at naglalakbay sa Beacon Hill. Kasama sa proyekto ang muling pagaspalto at mga pagpapabuti sa kaligtasan para sa mga taong naglalakad, nagbibisikleta, nagmamaneho, at sumasakay ng bus.

Ang proyekto ay kasalukuyang nasa maagang yugto ng disenyo, at nangangalap kami ng mga tugon mula sa komunidad upang magabayan ang aming mga disenyo. Ang proyekto ay nasa yugto ng disenyo hanggang taglagas ng 2027 at magsisimula ang konstruksyon sa 2028.

የBeacon Ave S የደህንነት ፕሮጀክት ማዕከላዊ ክፍል በBeacon Ave S በኩል ከ S Myrtle St እስከ 39th Ave S ይዘልቃል። ዋናው የፕሮጀክቱ ግብ በቢከን ሂል (Beacon Hill) ውስጥ ለሚኖሩ፣ ለሚሰሩ እና ለሚጓዙ ሁሉ ደህንነትን ማሻሻል ነው። ፕሮጀክቱ በእግር ለሚሄዱ፣ በብስክሌት ለሚጋልቡ፣ ለሚያሽከረክሩ እና የህዝብ ማመላለሻ አውቶቡስ ለሚጠቀሙ ሰዎች ዳግመኛ የመንገድ ንጣፍ እና የደህንነት ማሻሻያዎችን ያካትታል።

ፕሮጀክቱ በአሁኑ ጊዜ በመጀመሪያው የንድፍ ምዕራፍ ላይ ይገኛል፣ እና የኛን ንድፎች ለማሳወቅ ከማህበረሰቡ አስተያየቶችን እየሰበሰብን ነው። ፕሮጀክቱ እስከ 2027 ጸደይ ወቅት ድረስ በንድፍ ምዕራፍ ውስጥ የሚቆይ ሲሆን በ2028 ግንባታ ይጀምራል።

ናይ ፕሮጀክት ድሕንነት Beacon Ave S ማእከላይ ክፋል ኣብ Beacon Ave S ካብ S Myrtle St ክሳብ 39th Ave S ይዝርጋሕ። እቲ ቀንዲ ዕላማ ናይዚ ፕሮጀክት፣ ኣብ Beacon Hill ዝነብሩ፣ ዝሰርሑ ከምኡ’ውን ዝጓዓዙ፣ ሰባት ድሕንነት ምሉእ ብምሉእ ምምሕያሽ እዩ። እቲ ፕሮጀክት ንሰባት ብእግሪ ዝኸዱ፣ ብብሽክሌታ ዝጎዓዙ፣ መኪና ዝዝውሩ ከምኡ’ውን ኣውቶቡስ ዝወስዱ ሰባት ንምምሕያሽ ዳግመ-ማዕረግ መንገዲን ናይ ድሕንነት ምምሕያሻትን ውሑስ ምግባር እዩ።

እቲ ፕሮጀክት ሕጂ ኣብ ቀዳማይ ናይ ዲዛይን ደረጃ ኣሎ፣ ንዲዛይናትና ኣብ ጭብጢ ተመርኵስና ንምምራሕ ድማ ካብ ሕብረተሰብ ርእይቶ ንእክብ ኣለና። እቲ ፕሮጀክት ክሳብ ቀውዒ 2027 ኣብ ደረጃ ዲዛይን ክጸንሕ እዩ፣ ህንጸት ድማ ኣብ 2028 ክጅምር እዩ።

ផ្នែកកណ្តាលនៃគម្រោងសុវត្ថិភាពវិថី Beacon Ave S លាតសន្ធឹងតាមបណ្តោយវិថី Beacon Ave S ចាប់ពីវិថី S Myrtle St រហូតដល់វិថី 39th Ave S។ គោលដៅចម្បងនៃគម្រោងគឺការកែលម្អសុវត្ថិភាពសម្រាប់អ្នករស់នៅ អ្នកធ្វើការ និងអ្នកធ្វើដំណើរទាំងអស់នៅក្នុងតំបន់ Beacon Hill។ គម្រោងនេះនឹងរួមបញ្ចូលការក្រាលកៅស៊ូឡើងវិញ និងការកែលម្អសុវត្ថិភាពសម្រាប់អ្នកថ្មើរជើង អ្នកជិះកង់ អ្នកបើកបរ និងអ្នកជិះឡានក្រុង។

បច្ចុប្បន្នគម្រោងស្ថិតក្នុងដំណាក់កាលរចនាដំបូង ហើយយើងកំពុងប្រមូលមតិយោបល់ពីសហគមន៍ដើម្បីផ្តល់ព័ត៌មានសម្រាប់ការរចនារបស់យើង។ គម្រោងនឹងស្ថិតក្នុងដំណាក់កាលរចនារហូតដល់រដូវស្លឹកឈើជ្រុះឆ្នាំ 2027 ហើយនឹងចាប់ផ្តើមការសាងសង់នៅឆ្នាំ 2028។

July 16, 2026

What's Happening Now?

We're kicking off project design on Beacon Ave S between S Myrtle St and 39th Ave S and will soon have early design plans to share.

Please subscribe to our new email list to hear about upcoming news and engagement opportunities. You may also be interested in subscribing to the Beacon Ave S Safety Central Segment email list.

Project Area Map

Map showing project area on Beacon Ave S between S Spokane St and S Myrtle St.

Project Improvements

This project will build roadway improvements that make it easier to walk, bike, roll, and take transit, while continuing to support people driving, buses, and freight vehicles. Project elements include:

  • Multi-use path improvements from S Myrtle St to 39th Ave S to make it safer to walk, bike, roll, and take transit.
  • Enhance street crossings along Beacon Ave S between S Myrtle St to 39th Ave S to improve safety for people walking, biking, rolling, and taking transit. 
  • Redesign parking and travel lanes south of S Myrtle St, near the former Van Asselt Elementary School.
  • Update the S Myrtle St signal to improve traffic flow, create separation between different modes of travel, and keep all travelers safe.

Additional project elements will be informed by the City’s Complete Streets Policy (2007). The policy directs SDOT to design streets for people walking, rolling, biking, taking transit, and persons of all ages and abilities, while promoting safe operations for all users.

Background

We want to make it safer and easier to travel along Beacon Ave S for everyone, no matter how they get around. This project continues to build out the bike network connecting to the bike lanes on S Columbian Way, S Myrtle St, and the Chief Sealth Trail. We're planning a bike route in Beacon Hill to help this area meet the following transportation and community needs:

  • Make walking, biking, rolling, and taking transit safer for people of all ages and abilities.
  • Repave worn sections of the roadway to keep the street in good shape for years to come.
  • Build on the North Segment (Beacon Ave S and 15th Ave S Safety Project), which finished improvements from the Dr. Jose Rizal Bridge to S Spokane St in fall 2025.

We heard from community through the Seattle Transportation Plan and the 2024 Seattle Transportation Levy and they consistently identified Beacon Ave S as one of Seattle’s highest-priority corridors for safety and mobility improvements.

Residents emphasized concerns about:

  • Cars speeding
  • Difficult pedestrian crossings
  • Unsafe conditions for people walking, rolling, biking, and accessing transit

And that they want:

  • More reliable transit service
  • Improved access to Beacon Hill Link Lightrail Station
  • ADA upgrades
  • Safer connections to schools, parks, businesses, and other neighborhood destinations

This safety improvement project, in tandem with the Beacon Ave S Safety Central Segment project, directly responds to these community-identified needs by redesigning the street to improve safety, accessibility, and transit reliability, better supporting the diverse travel needs of Beacon Hill residents and businesses.

This project ties directly to the City's larger transportation goals:

  • The Seattle Transportation Plan (STP) is the city's 20-year vision for how people get around. This project supports its top goals of safety, mobility and equity.
  • The STP equity key moves guide our work, including centering the voices of communities of color and prioritizing investments in neighborhoods that have not received enough support in the past.
  • Beacon Hill is one of the highest equity priority areas in Seattle, so investing here helps meet the STP goal of directing resources where they are needed most.
  • The Seattle Transportation Levy helps pay for these corridor improvements. Beacon Ave S is named in the Levy as a corridor for paving, transit and bicycling investments.

Funding

This project is funded in part by the Seattle Transportation Levy and the Safe Streets for All Grant.

Schedule

Planning (completed): We began planning for this project in 2019 and was completed in 2025.

Design (in progress): We're kicking off design in spring 2026 and will finalize by fall 2027.

Construction: We will work with the community to understand their needs. We will share information about the construction schedule and activities. Construction is expected in 2028 - 2029.

Project Library

The following files are available upon request for anyone who wants extra details about this project and its history. To requeset a file, a screen-reader friendly or a translated copy, or a walk-through of any of this information with one of our team members, please email us at BeaconAveSouth@seattle.gov. 

  • November 2020 Outreach Summary
  • November 2020 Drop-in Session Q&A
  • Project Map (All Segments)
  • Middle Segment Map
  • 2019 Bike Master Plan Implementation Plan Outreach Summary
  • 2019 Bicycle Master Plan Implementation Plan
  • 2019 Beacon Hill Station Access and Mobility Plan
  • 2014 Bicycle Master Plan  

Transportation

Angela Brady, Acting Director
Address: 700 5th Ave, Suite 3800, Seattle, WA, 98104
Mailing Address: PO Box 34996, Seattle, WA, 98124-4996
Phone: (206) 684-7623
684-Road@seattle.gov

Sign Up for Latest Updates

Subscribe

The Seattle Department of Transportation (SDOT) is on a mission to deliver a transportation system that provides safe and affordable access to places and opportunities for everyone as we work to achieve our vision of Seattle as a thriving, equitable community powered by dependable transportation.