Standard Specifications and Plans

2026 Seattle DRAFT Plans and Specs comment period

The City of Seattle is conducting a 60-day interdepartmental and public comment period from November 7 to January 7, 2026, for our 2026 Proposed DRAFT Standard Specifications and Standard Plans for Municipal Construction.

The City’s “Plans and Specs,” as they are often called, apply whenever any public or private construction is performed in the City of Seattle’s Right of Way. These Construction Standards also serve as the primary contract documents for public works construction contracts.

The comment period for the PROPOSED 2026 edition has ended. Comments received will be considered for inclusion in the 2026 edition as time allows for Signatory Department review and approval. The Signatory Departments for the City of Seattle Construction Standards are: Finance and Administrative Services, Seattle Department of Transportation, Seattle City Light, Seattle Public Utilities, Seattle Parks and Recreation, and the Seattle Center as shown on the inside front cover. Otherwise, comments received may be used for future General Special Provisions in City Contracts, published as Amendments to the 2026 edition or rejected. The 2026 edition will be published on-line and in hard copy form at the end of February 2026.

 

Front cover of the 2023 Standard Specifications, with a photograph of downtown Seattle.    Front cover of the 2023 Standard Plans, with a photograph of downtown Seattle.

2023 Construction Standards

2023 Standard Specifications (PDF) 

To improve functionality, section references in the 2023 Standard Specifications have been cross-referenced (linked) to the corresponding section. To navigate back in the document, press Alt+(left arrow).

2023 Standard Plans (PDF)

2023 CAD Drawings of Standard Plans 

2023 Redline Markups of Standard Plans (PDF)

The Redline Markups show how the 2020 Standard Plans were changed to create the 2023 edition.

Summary of Edits (PDF)

This table summarizes edits made to the 2020 edition of the Construction Standards to create the 2023 edition of the Construction Standards.

2023 Construction Standards Amendments

Recommended Amendments to the 2023 edition of the Standard Specifications and Standard Plans are provided below (12/31/24).

Public Utilities

Andrew Lee, General Manager and CEO
Address: 700 5th Avenue, Suite 4900, Seattle, WA, 98104
Mailing Address: PO Box 34018, Seattle, WA, 98124-5177
Phone: (206) 684-3000
SPUCustomerService@seattle.gov

Newsletter Updates

Subscribe

Sign up for the latest updates from Public Utilities

Seattle Public Utilities (SPU) is comprised of three major direct-service providing utilities: the Water Utility, the Drainage and Wastewater Utility, and the Solid Waste Utility.