Skip to main content
This is an official government website.

Search Results

Search

Filters

Filters

Results

851 to 875 of 83576
  1. Irrigation Only Water Services Irrigation Only Services New or existing water services used exclusively for irrigation (ie. irrigation only) may be eligible for exemption ...
  2. Installing Water Mains Installing Water Mains A water main extension (WME) or system improvement will be required if a parcel requesting new water service does ...
  3. Private Water Line Inspections Water Line Inspections We must inspect the entire length of water service piping outside the building before you cover it. This includes ...
  4. Street Restoration Street Restoration When streets and sidewalks are removed or damaged during water service installation or when shutting off existing water ...
  5. Fire Hydrants Fire Hydrants Fire hydrants are owned and maintained by Seattle Public Utilities (SPU). Hydrants are most commonly used for fire ...
  6. Hydrant Permit Hydrant Permit Seattle Public Utilities (SPU) must approve and issue a hydrant permit before you can temporarily use a hydrant for a ...
  7. Hydrant Permit Requirements Hydrant Permit Requirements Seattle Public Utilities (SPU) must approve all hydrants before you can use them for dedicated site use or for ...
  8. Hydrant Flow Request Hydrant Flow Request On September 21, 2023, SPU activated its Water Shortage Contingency Plan and asked customers to voluntarily use less ...
  9. Sewer & Drainage Property owners and developers can find specifications, tap procedures, inspections, and rain garden info for stormwater, groundwater, and ...
  10. GSI Construction Inspection Requirements GSI Construction Inspection
  11. Core Tap Procedures for Storm and Sewer Mains Core Tap Procedures These procedures describe how to connect to existing storm and sewer mains and miscellaneous structures owned by ...
  12. Maintenance Hole Access Maintenance Hole Access What should I do before entering a maintenance hole? For emergency access or to report damage to a Seattle ...
  13. Apply for Sewer Submeters Information required to apply for a sewer submeter. Application resources Sewer Submeter Billing Application Form (PDF) Installation ...
  14. Sewer Submeter Program Find sewer submeter program information and other details. Client Assistance Memo 1102 The Sewer Submeter Program was instituted in the ...
  15. Sewer Submeter Questions & Answers Answers for all questions related to Sewer Submeters. Questions and answer content Why must we have sewer submeters with a remote encoder ...
  16. Collection & Disposal Construction projects can learn how to salvage or dispose of solid waste during and after the build, including hauling requirements and dust ...
  17. Solid Waste Storage and Access for New or Remodeled Buildings Storage & Access Client assistance memo 1301 Seattle Land Use Code SMC 23.54.040 requires solid waste container storage and access for ...
  18. Construction and Demolition Waste Management Construction & Demolition Before Project Start Plan for Salvage You may need to complete a  Salvage Assessment online . For questions ...
  19. Third-Party Hauling Requirements for Construction Materials Hauling Requirements Trucks hauling construction and demolition materials.   Many construction and demolition contractors will ...
  20. Qualified C&D Recycling Facilities Qualified Facilities Mixed Waste C&D Recyclers The below table is updated as needed to reflect the current list of Qualified Facilities. ...
  21. Asbestos in Construction and Demolition Asbestos Federal, state, and local regulations require that all asbestos and other hazardous materials be removed prior to demolition. ...
  22. Dust Control and Water Usage Dust Control and Water Usage Water must be sprayed during demolitions to help control windblown fine materials such as soil, concrete dust ...
  23. Land Survey Services Seattle Public Utilities provides land survey services only to other City of Seattle departments but has data for everyone to use. Land ...
  24. Survey Forms Survey Forms Surveyors should use the following grade sheet form when submitting cut/fill data to inspectors and contractors for ...
  25. Survey Data Survey Data You can find survey data in the Engineering Records Center and Survey Office on the 47th floor of the Seattle Municipal Tower. ...